Your partner for
EC-verification
According to directive (EU) 2016/797
The manufacturer or its authorized representative requests an EC-verification at a Notified Body of its choice. The general process of an EC-verification is described as follows:
An EC assessment is carried out according to the applicable technical specifications for interoperability (TSI) and the chosen module. The following table shows all possible modules according to decision 2010/713/EU:
Assessment modules |
|||||||||||||
Subsystems | Constituents | ||||||||||||
TSI | SG | SB | SD | SF | SH1 | CA1 / CA2 | CB | CD | CF | CH | CH1 | CV | |
INF | x | – | – | – | x | x | x | x | x | x | x | x | |
INF-PRM | x | x | x | – | x | x | x | x | x | x | x | x | |
INF-SRT | x | – | – | – | x | – | |||||||
ENE | x | – | – | – | x | x | x | – | – | x | x | – | |
CCS | x | x | x | x | x | – | x | x | x | – | x | – | |
RST | – | x | x | x | x | x | x | x | x | x | x | x | |
RST-PRM | – | x | x | x | x | x | x | x | x | x | x | x | |
RST-SRT | – | x | x | x | x | – | |||||||
WAG | – | x | x | x | x | x | x | x | x | x | x | x | |
NOI | – | x | x | x | x | – |
x applicable assessment procedure
– non-applicable assessment procedure
Download:
- 2017/713/EU decicions on modules for the procedures for assessment of conformity, suitability for use and EC verification to be used in the technical specifications for interoperability adopted under Directive 2008/57/EC of the European Parliament and of the Council
- We are happy to provide our certification agreement as well as certification schemes on request.
Arsenal Railway Certification GmbH
Floridsdorfer Hauptstraße 30, 1210 Wien, Österreich
Arsenal Railway Certification Schweiz AG
Victor von Bruns-Strasse 19, 8212 Neuhausen am Rheinfall, Schweiz